Skip to main content

Retro tiled shower regrouted with white 4" square tiles and random pattern navy blue tile layout

 




After couple decades, it was time this tiled shower got cleaned up and regrouted. One day of cleaning mildew along tub line and removing old grout. The next day, new white grout installed on this retro tile shower with random pattern layout of navy blue tiles.



Great customer to work for. You can see her review she left for Matt Cupan TileWorks: 






Live in New Hampshire and need your shower re-grouted? 

Call Matt Cupan at: (603)785-0869


Comments

Popular posts from this blog

Master bath remodel in Bedford, New Hampshire with Subway tile shower and Herringbone floor

  Master bath remodel in Bedford, NH with subway tile shower and herringbone floor. Installed by Matt Cupan TileWorks (603)785-0869 Tile prep: Waterproofing  Used Laticrete HydroBarrier Plus to coat over cement board walls and mud shower pan. Customer wanted floor tile set first. So wall would be set on top of. And we installed granite threshold on top of curb. Tile installation: shower walls Installed biege subway tiles featuring a rustic edge. Using level to keep lines straight. Planning on remodeling your Master bath shower? Call Matt Cupan TileWorks (603)785-0869 Tile installation for Southern New Hampshire.

Amherst, NH Bath remodel 12x24 tile floor and wall with deco border

  It starts with a dream, vision and a few tile samples. We build it from the ground up from there. Call Matt Cupan TileWorks  (603)785-0869

Master bath remodel in Hudson, NH with tile shower and custom floor pattern

Homeowners had fire and used insurance to remodel entire house. Starting with their master bath. They had a framing company install studs to enlarge their master bath. Making a shower area with commode. And then adjoining a dry station for makeup with vanity. And walking closet. Couple had a local tile shop design a floor tile and wall layout for custom shower remodel in Hudson, New Hampshire. And sourced tile material for job. We started preparation with Ditra uncoupling membrane over subfloor. To be used in conjunction with a Schluter radiant heat system to be wired underneath tile. Installed cement board on shower walls and ceiling. Taped and mudded joints and seams. And applied 3 coats of Laticrete HydroBan waterproofing. Then floated a Portland cement and sand mix dry pack with a 1/4" slope towards new drain flange. The tile design layout drawings called for a custom baseboard cut out of 12x12 pished porcelain tile. And then a pencil liner border installed just above that.  W